Request a technical study

Specify your requirement — power, voltage, context, deadline — and receive a costing adapted to your project.

What you receive within 48h

Our engineering team provides a structured response adapted to your project:

MV/LV sizing according to power and voltage

Reinforced concrete substation configuration and MV/LV integration to specification

Installation constraints and site environment

Indicative manufacturing and delivery timeline

Preliminary costing based on your specification

< 1 %
non-conformity rate at acceptance
100 %
substations FAT-tested before dispatch
48 h
response time for any costing request
1–3 d
commissioning on site after delivery

Receive a costing within 48h

Response within 48 working hours

Response within 48 working hours — our engineering team analyses your request and responds with a detailed costing and technical specifications adapted to your context.

No-commitment technical study — you receive an analysis of your need (power, voltage, environment, timeline) with a recommended model and indicative price range.

Your information is strictly confidential and used solely to respond to your enquiry, in accordance with our privacy policy.

How to reach us

Address

Industrial Zone, Berrechid
Province of Berrechid — Morocco
33 km from Casablanca

Opening hours

Monday – Friday: 8:00 – 17:30
Saturday: 8:00 – 13:00

Visit our factory

ETFP welcomes clients and partners to visit the Berrechid factory. You can observe the concrete manufacturing process, the MV/LV integration workshop and the FAT testing laboratory.

To arrange your visit, contact us by phone or via the form above.

Call to arrange a visit View the FAT process